Full House Rewire and Lighting Upgrade Project

Summary
A complete full house rewire paired with new indoor and outdoor lighting systems and National Inspection Council for Electrical Installation Contracting (NICEIC) approved certification. The project modernised the property, improved lighting performance and ensured full electrical compliance.
Overview
Our client approached us with concerns about an ageing electrical system, inconsistent lighting performance and the need for an updated safety certification. After an initial consultation and site inspection, we recommended a full house electrical rewire along with a complete indoor and outdoor lighting upgrade. The project also included comprehensive testing, certification and a detailed post-project handover.
It was essential to us that the client felt informed throughout the process. So, after assessing the property size, access points and existing infrastructure, we provided a realistic project timeline and kept the client updated at every stage.
Project Scope and Services Delivered
- Rewiring and Electrical Installations
The core of the project was a full house rewire. This included removing outdated wiring, installing new cabling and upgrading the fuse board to meet current regulations. We also fitted new sockets, switches and lighting points throughout the property.
Before starting work, our team carried out a visual inspection of the existing system. After completing the rewiring, we performed thorough testing and inspection to confirm that everything operated safely. The team handled all site clean-up and organised a final customer debrief to walk through the report and answer any questions.
- Indoor and Outdoor Lighting Installations
The client wanted a brighter, more energy efficient home. With this in mind, we designed a modern lighting layout for both indoor and outdoor areas. This included energy efficient lighting systems, smart lighting control solutions and the replacement of outdated lighting fixtures.
The upgraded lighting not only improved the appearance of the home but also reduced long-term energy costs.
- Electrical Testing and Certification
Once installation work was completed, we carried out a full EICR (Electrical Installation Condition Report). The property passed compliance inspections, and the client received NICEIC-approved certification. We also provided safety testing results and clear documentation for future reference.
Timeline and Project Outcome
When discussing how long a full house rewire takes, we explained that timing depends on property size, existing wiring condition and the level of additional electrical work required. In this case, the project was completed within the expected schedule, and the client appreciated receiving a clear timeline before work began.
The result was a fully modernised electrical system that met all safety standards, a stylish and efficient lighting setup and complete certification for peace of mind. The client expressed confidence in the quality of the work and satisfaction with the communication throughout the project.
Looking to rewire your home or upgrade lighting? Contact us today for a free quote.


